Why do I need a Party Wall Surveyor?
4 September 2022

Making alterations to your home can feel daunting, with planning, Building Control and your builder's programme all to manage at once. One of the most common questions we are asked is whether a party wall surveyor is really necessary. Whether you are extending or renovating, here is what you need to know about when the Act applies and what a surveyor does for you.
The short answer
You need a party wall surveyor when your works fall under the Party Wall etc. Act 1996, typically work to a party wall under Section 2, a new wall at the boundary under Section 1, or excavation near a neighbour's foundations under Section 6, and your neighbour does not consent in writing. The surveyor resolves the resulting dispute under Section 10 by making a Party Wall Award.
What is a party wall?
A party wall is a wall that stands on the land of two owners and separates their buildings, such as the wall between two semi-detached or terraced houses. The Act also covers party fence walls, such as a garden wall built astride the boundary, and other party structures, including the floors and walls separating flats.
Both owners have rights and obligations in respect of these shared structures, which is why works affecting them are governed by the Act rather than left to informal agreement.
When does the Party Wall Act apply?
The Act applies to three broad types of work. If your project includes any of them, notice must be served on the Adjoining Owner.
- Section 1, new walls at the boundary. Building a new wall on or astride the line of junction. One month's notice, using a Line of Junction Notice.
- Sections 2 and 3, work to an existing party wall. Section 2 lists the works, such as cutting in to insert a steel beam, raising or underpinning the wall, or removing chimney breasts. Notice is served under Section 3 as a Party Structure Notice, with two months' notice.
- Section 6, excavation near a neighbour's building. Excavating within 3 metres of a neighbour's building to a lower depth than their foundations, or within 6 metres where the excavation would cut a 45-degree line drawn down from the bottom of their foundations. One month's notice.
Many everyday projects trigger more than one section. Our guide to three common renovation works that affect party walls gives typical examples, and our explainer on what a party wall notice is covers how notices work.
When do I not need a party wall surveyor?
You do not need a surveyor if the works fall outside the Act, or if your neighbour consents to the Notice in writing. Minor works such as fixing shelves, adding sockets or replastering are generally not notifiable. A loft conversion on its own does not trigger Section 6, although the steel beams it usually involves may well fall under Section 2.
Where the Adjoining Owner gives written consent, no dispute arises and no surveyor needs to be appointed. Many owners still choose to have a Schedule of Condition prepared, so there is a clear record if a question about damage comes up later.
What happens if my neighbour does not respond?
If the Adjoining Owner does not respond within 14 days, the Act treats them as having dissented, under Sections 5 and 6(7). A dispute is then deemed to have arisen and surveyors must be appointed.
If they then fail to appoint a surveyor within a further 10 days of a request under Section 10(4), the Building Owner may appoint a surveyor on their behalf under Section 10(4)(b), so the process cannot be stalled.
What does a party wall surveyor do?
A party wall surveyor administers the procedure under the Act and determines the terms on which the works proceed. They do not design or supervise the works, which remains the job of the Building Owner's engineer and builder. In practice, the surveyor will:
- Confirm which sections apply and that the Notice is valid.
- Prepare a Schedule of Condition of the adjoining property before work begins.
- Review the structural drawings and method of work.
- Agree and serve the Party Wall Award, setting out what may be done, how and when, along with access arrangements and how any damage will be made good.
- Deal with any damage claims under the Award, applying the duty to compensate in Section 7(2).
Either owner may appeal the Award to the County Court within 14 days of service under Section 10(17). The surveyors' jurisdiction over the matters it determines ends once the Award is served.
Do I have to pay for my neighbour's surveyor?
Usually, yes. Under Section 11 of the Act, the surveyors' reasonable costs are generally borne by the Building Owner where the works are for their benefit. That includes the Adjoining Owner's own surveyor if they choose not to use an Agreed Surveyor. Our guide to who pays party wall surveyor fees explains the detail.
Frequently asked questions
Is the Party Wall Act part of planning permission?
No. Planning permission, permitted development and Building Regulations are separate from the Act. Having one does not satisfy the other.
Did the Act always apply across England and Wales?
No. Party wall rules previously applied in inner London under the London Building Acts. The Party Wall etc. Act 1996 extended a single procedure across England and Wales.
How long does a party wall notice remain valid?
A Notice lapses if the works have not begun within 12 months of service, under Sections 3(2)(b) and 6(8).
Speak to a Chartered party wall surveyor in North London
If you are planning works and are not sure whether the Act applies, or you have received a Party Wall Notice from a neighbour, we can help you understand where you stand. Hudson Party Wall Surveyors is a Chartered, RICS-regulated practice based in North Finchley, acting for Building Owners and Adjoining Owners across North London. You can contact us here, or call Simon on 020 3488 7747 or email simon@hudsonpartywallsurveyors.co.uk.
Need help with your Party Wall Matters?
We’re here to help. Call for free advice or book a Chartered Party Wall Surveyor to call you at your convenience.